PROJECTS

Each work of Alpenglow is a landmark in itself. The company has set a class apart benchmark for the government of Tamil Nadu and its competitors to match its standards. From infrastructural construction to specialization in excavation we are listed as the top Construction Company in Coimbatore.

Several important state governmental projects and programs are implemented and developed by Alpenglow group. The company has earned the tag of being the prime Earthwork Project Company in Tamil Nadu.

Some of its key projects include

  • Augmentation of water supply improvement in 7 town panchayats in Bodinaickanur union with Kottakudi river as source.
  • Water supply improvement scheme to Boodhipuram 39 town panchayat with Mullayar river reservoir as source.
  • Improvement and strengthening road work from Avinashi to Coimbatore km 154/1 to km 158/0 (National Highways).
  • Widening and Strengthening two lanes to four lanes from Coimbatore to Maruthamalai road km 0/0 - km 3/1 (State Highways of Tamil Nadu).
  • Industrial road and storm water drain for Zhoransky (German based multinational company) private limited in Annur at Coimbatore.
  • Industrial road for Shanthi poultry farm in Papampatty at Coimbatore.
  • Construction of overhead watertank (25 lakhs litres) and ground level water sump (10 lakhs litres) including 10 borewells in Kavundampalayam municipality at Coimbatore district.
  • Construction of effluent treatment plant capacity (tank size 10 lakh litres) for teaktex process in complex India limited at Kanjikode, Kerala state.
  • Construction of industrial complex, industrial roads, watertank and borewells for teak tex processing complex limited at Kanjikode, Kerala state.
  • Construction of industrial road and storm water drain for Patspin India limited at Kanjikode, Kerala state Construction of industrial road and storm water drain for Rubfilla international company limited at Kanjikode, Kerala state.
  • Construction of river crossing bridge reinforced cement concrete bridge (4 span of 10m and height 10m open foundation) in Ooty district.
  • Widening and improvement Ghat road from Ooty to Gudalur- Mysore road km 6/0 to 30/0 in Kallaty at Ooty district.
  • Improvements and strengthening Ghat road from Ooty to Kothagiri Sathy road km 24/6 to km 34/2 in Kothagiri, Ooty district.
  • Construction of 100 bore holes with watertanks and Pumps for panchayats of coimbatore dist (annual year 2010-2011).
  • Construction of five span high level bridge at Thondamuthur, Coimbatore.
  • Construction of Two span high level bridge at Marapalam, Madukkarai, Coimbatore.
  • Laying of 10 Kms Bitumen road at Thondamuthur region well within the city limits.
  • Laying of 8 Kms Bitumen Road at Avarampalayam, Coimbatore.
  • Widening & Strengthening of Road of 8 Kms at Saravanampatty, Coimbatore.

Challenges and Excellence - An Example


Part 1

One of the most astounding works of Alpenglow includes the laying of road on the Ooty-Mysore road.

The company was challenged to create a 16km road on a hilly terrain which had more than 38 windings road, dotted with steep hairpin turns, long S-Curves and sharp descents over an elevation of 1400m.

Apart from that the chilly weather of the city and the unavailability of the required hot Bitumen mix at the work site made it very difficult for the masons to lay the road. The entire mix was transported from the plains.

Yet the company took up this perilous task, and within a span of just 50 days the road was ready.

And it was not just ready, it was a work that reflected absolute quality and excellence. Even with harsh weather conditions the grit of the road is intact and smooth to drive on.


Part 2

Creating a bridge over a river is never easy especially when the construction was done decades back.

The bridge was made two decades ago when most of the civil firms were not even equipped or skilled at making such a bridge.

The area was prone to floods and hence to solve the challenge a 6 spam of 7mts Bridge was created in pile foundation. To keep the bridge sturdy and to speed up the work the men had worked below the waterline to ensure the foundation was strong. Coffer dam was built to control and divert the flow of the water.

With skilled expertise, state of the art infrastructure and a passionate dedication the project was completed in just 3 months.